R0647: PASS

Descriptive statistics, no trading costs in the probabilities (the backtest columns alone use estimated costs). Rules were discovered and tuned on 2022-01 → 2024-12 only, frozen, then tested once on 2025-01 → 2026-10. Millions of hypotheses were searched, so read the corrected p-values and the out-of-sample columns, not the training hit rates. Not investment advice; not a trading system.

Rule: When size of the move from the open to 11:00 (either direction) ≤ 0.10% (≈24 pts at 25,000) AND range so far (high−low since 09:15) ≤ 0.39% (≈98 pts at 25,000) AND India VIX (prior day's close) ≤ 12.1 at 11:00

Target: the day closes more than 100 pts beyond the open in the direction of the move so far  ·  Decision time: 11:00 IST (uses bars up to 11:00 only)  ·  Method: subgroup  ·  Family: level / structure

0%train hit (n=36) vs base 35% · lift 0.00
12%OOS hit (n=24) vs base 41% · lift 0.31
[4%–31%]OOS Wilson 95% CI
0.011OOS BH q (all) · family BH q 0.007 · Holm 1.000
0.003OOS matched-random placebo p

Verdict criteria

Train p 4.6e-07; train BH q 4.4e-05; train Holm 1.000 (corrections over all 9,242,869 hypotheses); whole-pipeline shuffled-label placebo family-wise p 0.238 (100 permutations). Extra conditions beat the best single condition OOS: True.

By year

yearrule dayshitbase (all days)lift
20220–39%–
2023330%25%0.00
202430%40%0.00
2025 (OOS)120%44%0.00
2026 (OOS)1225%37%0.68

Spot-points backtest (estimated costs)

enter at 11:00 price against the move direction; stop 0.4% of entry; exit at close. Costs: Nifty futures round-trip model from nifty-setups-backtest/src/costs.py (brokerage, exchange, SEBI, stamp, GST, STT by date: 0.0125% → 0.02% from Oct-2024 → 0.05% from Apr-2026) + 0.5 pt slippage per side; spot used as a futures proxy (basis ignored); stop-first on ambiguous bars.

windowtradeswin rateavg net ptsavg gross ptstotal netmax DD ptsPF
train 2022–24 (in-sample)3656%+4.8+10.5+174.6+176.6+1.3
OOS 2025–262450%+4.7+16.0+112.3+265.7+1.2

equity curve

trades.csv · Generated 2026-10-10 00:44 IST.